Lewis, Yockey & Brown, Inc.


Project Catagory

 


Water Supply & Distribution

36” East Side Water Transmission Main ( Fort Jesse Rd. Pumping Station to Hershey Rd. to College Ave.), Bloomington

24” Hershey Rd. Water Transmission Main (Empire St. to Ireland Grove Rd.), Bloomington

24” West Side Water Transmission Main ( Washington St. along Future MLK Dr. to Oakland Ave. thence West under I-55/I-74), Bloomington

12” Main Street Water Main (Empire St. to Olive St. through Downtown Bloomington)

Route 150 Water Main ( Hamilton Rd. to State Farm Flexible Storage Facility), Bloomington

Route 150 Water Main II (State Farm Flexible Storage Facility to Kickapoo Creek)

24” Lincoln St. Water Main Extension ( Veterans Parkway to Morrissey Dr.), Bloomington

W. Market St. Water Main Relocation, Bloomington

16” Ft. Jesse Road Water Main ( Airport Rd. to Towanda Barnes Rd.), Bloomington

250,000 Gallon Water Tower, El Paso, Goodfield and LeRoy

500,000 Gallon Water Tower and Potable Water Booster Pumping Station, Washington

Potable Water System Study, Cooksville, Ellsworth and LeRoy

Water Treatment Plant Study, LeRoy

Water Treatment Plant Improvements, Colfax, Goodfield, Minier and Congerville

Water System Analysis and Report, Goodfield

Well and Raw Water Main Extension, Congerville, Ellsworth, Goodfield and Minier

Elevated Water Storage Tank (CDAP Grant), Benson and Ellsworth

Water Treatment and Distribution Study and Design (CDAP Grants), Deer Creek

I-74 Water Main Extension, Goodfield

Water Treatment Plant (CDAP Grant), Ellsworth